News

23 March 2020

The wind farm under management and already in operation consisting of 24 wind turbines (Senvion model MM82 and MM92) for a total capacity of 48 MW in Mazara del Vallo (Trapani), has been expanded with two production units – from 3 wind turbines each (model Vestas V126) for a total additional capacity of 18 MW; the supply and installation of the wind turbines was entrusted to Vestas.
All the other activities for the realization of the expansion (permitting, civil and electrical works, purchases, consultancy), the testing activities, as well as management, coordination and harmonization between all the different subjects involved and their respective activities, were carried out by Volta Green Energy Srl (who with his professionalism had participated in the development phase of the initiative).
Volta Green Energy S.r.l. has therefore directly contributed to the creation of one of the first wind farms in Italy which, since February 2020 successfully, has been operating on a merchant basis, namely, which is supported economically without the use of incentivized production.